Planning and Building Control for a New Conservatory Roof in Norwich

Planning asks how a roof looks and how it affects the street. Building control asks whether it is sound, safe and properly insulated. Below is how each applies in Norwich, as a guide and not legal advice.

A narrow cobbled lane lined with timber-framed and red-brick houses, old street lamps and people walking

Ask most people what permission a new conservatory roof needs and they will say planning. For this job, planning is rarely the issue. The rule that trips people up is building regulations, and it applies most to the roof people most want: a tiled one.

Planning: a phone call at most, for most houses

The Planning Portal files the bulk of roof changes under permitted development. In plain terms, the law grants permission in advance for them, up to certain limits, and swapping a conservatory roof for one of the same kind normally stays well inside those limits.

There is a sting in the tail, though. Should the replacement transform the roof's form or its appearance, the Portal says you could need an application. A handful of Norwich situations call for a quick check with the council before anything is ordered.

  • Conservation areas. There are 17 in Norwich. The council warns that people living in them may need consent for roof alterations, extensions and things like new doors or windows, and some areas have Article 4 Directions that strip out particular permitted development rights. The council lists them here.
  • Listed buildings. A listed house sits outside the usual assumptions, so talk to the council before changing anything attached to it.
  • Flats and maisonettes. Householder permitted development rights simply do not exist for these.
  • Strings attached earlier. Some conservatories were approved with conditions, and some houses had their permitted development rights taken away. Either restriction still holds.

Outside those cases, a planning application is unlikely. Norwich City Council is the planning authority for the city.

Building regulations: where a solid roof changes things

Conservatories escape the Building Regulations through a short list of conditions set out in Schedule 2 (2010). Each box exists for a reason, which helps explain why a new roof can change the picture.

  • Built at ground level, with 30 square metres of floor or less. A modest one-storey room poses little risk to anyone.
  • Safety glazing. Doors and low panes have to be glass that will not injure someone who walks into it.
  • A proper barrier between it and the house. External-grade walls, windows or doors mean a chilly conservatory does not drag down the warmth of your home.
  • No house heating running into it. Warming a glass room burns energy, and the exemption is built on the idea that you will not.

Then comes the part that decides things for roofs. A government circular from 2013 makes the point that alterations inherit the exemption only when the finished room still qualifies as a conservatory. Swap much of the glazing for something solid, it warns, and that may no longer be true.

Tiles do exactly that. LABC spells out the result: once insulation and tiles go on, the exemption is lost. From then on it is building work, judged against Approved Document L, with the inspector testing whether frames, door supports and foundations can bear the heavier roof. Put simply, plan on a building regulations application for any tiled roof.

Norwich's building control service

Norwich gets its building control from CNC Building Control. It is run jointly by five councils, namely South Norfolk, Norwich City, Broadland, King's Lynn and West Norfolk, and Fenland, from bases in Norwich and Wisbech. Its fees sit on a charges page, and you can also ask it for a quote online.

A registered private approver is the alternative. Roofing firms frequently file the paperwork themselves, so ask at quote stage whose name goes on it and whose pocket the fee comes from.

Two routes to approval

England offers two ways in. What separates them is whether the checking happens on paper first or on site as the job goes along.

  • Full plans. Drawings go in and get checked first. Expect a decision inside five weeks (two months if you agree to more time). Less risk, plus an approval notice up front and a completion certificate once it is built.
  • Building notice. No drawings needed. Builders can start 48 hours after submission, with compliance judged on inspection visits. It works for small, straightforward jobs, but any problem found means changing work that is already built, at your risk.

With a tiled roof, where so much depends on what the frames and base can take, the full plans route usually gives more peace of mind. The Planning Portal describes the steps.

Conservatories in Wales or Scotland

Both follow a similar logic with their own details. Guidance from the Welsh Government describes its own conservatory exemption, and a roof that takes away the glazed character puts the room outside it. North of the border the exemption stops at 8 square metres of floor, which leaves most conservatories needing a building warrant, solid roof or not. There is no building notice route north of the border.

Awkward cases

New glass, same frame: is there any paperwork?

Rarely. Glass replaced with glass leaves the room a conservatory, which is what keeps the exemption alive. Low panes and doors must still be fitted with safety glass, as before.

Our tiled roof was fitted without approval. Now what?

Councils offer something called regularisation for jobs finished without approval, where the finished job is assessed after the fact. Applying before work starts is far simpler, because nothing has to be checked through a plastered ceiling.

Does it have to be the council that inspects?

No. CNC Building Control is one option, and a registered private approver is the other. Whichever you use, insist on a completion certificate when the job is signed off.

Where this comes from

Rather someone else did the forms?

Fitters around Norwich deal with CNC and private approvers week in, week out. Most will file the application for you.

What happens to your request afterwards is set out on the way it works page.